All projects

Multnomah Village · 1998 condominium

One-wall plus a 5 ft island

A condominium with a concrete slab, no chase for plumbing, and a breakfast bar that held nothing. The island stayed dry and took the induction cooktop instead.

From
One-wall with a breakfast bar
To
One-wall with a working island
Footprint
112 sq ft
On site
6 weeks on site
Contemporary condominium kitchen with a porcelain waterfall island

The brief

What the owners asked for

A slab floor rules out running waste to an island, which the clients had been told meant no island at all. It does not: it means the island cannot have a sink.

Putting the induction cooktop in the island instead put the cook facing the room, kept the sink on the wall where the waste already was, and gave a 5 ft prep run.

Before

A breakfast bar with no storage and 30 in of prep counter in the whole kitchen.

After

5 ft of island prep, an induction cooktop facing the room, and 41 in aisles both sides.

The moves that made the difference

  • Breakfast bar removed, 60 in by 39 in island built with storage on both faces
  • Induction cooktop in the island with a ceiling-mounted 42 in canopy
  • Vertical duct through the ceiling void to the roof, 8 in round
  • Receptacles in the island side face, fed through a floor core agreed with the HOA
  • Full-height larder at the end of the wall run replacing a wall cabinet

Specification

What went in

Budget band $58,000 - $69,000. A sample figure for orientation, drawn from work of this scope rather than from this client's contract.

Cabinetry and counter detail from the finished kitchen
Cabinetry
Frameless, matte laminate door, aluminium edge pull
Counter
Porcelain slab, 12 mm with a mitred 2 in edge, waterfall end
Splashback
Porcelain slab, full height on the wall run
Floor
Existing engineered timber retained
Ventilation
42 in ceiling canopy, 500 CFM, vertical 8 in duct

Next project

The 92 inch galley

Sellwood-Moreland · 1912 foursquare · 7 weeks on site

Read it

Where we stand

Your kitchen has its own constraints. The survey is where we find them.

Two to three hours on site, then two scale layouts with the clearances written on them. If the answer turns out to be a smaller job than you expected, that is what we will tell you.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.