Payments tied to milestones

Nothing is due for work that has not happened. Five stages, each one tied to a thing you can stand in the room and see.

Design fee
$1,450 (sample)
Stages
5
Final payment
After the punch list
Contract and drawings on a table during a client meeting

Payment schedule

Five stages on a full remodel

Percentages below are our standard schedule and are written into your contract. Smaller jobs such as refacing use a two-stage schedule instead.

  1. 01

    Design fee

    Covers the measured survey, the services plan and two scale layouts. Credited in full against the build if you proceed with us.

    $1,450 (sample)

    At the start

  2. 02

    Cabinetry deposit

    Released to the cabinet maker the day drawings are signed, because it is the longest lead item on the job.

    30% of contract

    On signing

  3. 03

    Start on site

    Due on the first day of demolition. Covers the trades booked for the rough-in stage.

    30% of contract

    Week 1 of the build

  4. 04

    Stone template

    Due when cabinetry is set, levelled and templated, which is the point the kitchen is visibly a kitchen again.

    25% of contract

    Mid build

  5. 05

    Completion

    Due after the punch list is walked with you and every item on it is signed off. Not before.

    15% of contract

    After the punch list

Sample schedule for illustration. Your contract states the exact figures and dates, and Oregon law limits what a contractor may take in advance.

Funding

Four routes clients use

Cash or transfer

The most common route. No fees, no third party, payments staged as above.

Home equity line

Many Portland clients draw on a HELOC for a kitchen. Your bank sets the rate; we supply the contract and schedule they will ask for.

Contractor financing

We can introduce you to a third-party lender that funds residential remodels. Approval, rate and terms are entirely theirs, not ours.

Phased build

Split the work across two budget years: cabinetry and stone first, flooring and lighting in the second phase. Drawn as one plan, built in two visits.

We are kitchen builders, not licensed financial advisers, and nothing here is financial advice. Any lender introduction is exactly that: an introduction. Terms, rates and approval are between you and them.

Engagements

What each level buys

The measured survey stands on its own. If you take the drawings to another builder, they are yours and we will answer their questions.

$1,450

Measure and plan

A measured survey and two scale layout options, whether or not we ever build it.

  • Two to three hour measured survey with services plan
  • Two scale layouts with triangle and clearance figures
  • Elevations for the chosen layout
  • A written outline specification and budget band

Sample price. Credited in full against a build with us.

Book a consultation

From $24,000

Cabinetry refit

New cabinetry and stone in the layout you already have, with no services moved.

  • Survey, drawings and full specification
  • Cabinetry, internal fittings and hardware
  • Countertop template, fabrication and install
  • Splashback set-out and tiling
  • Four to six weeks on site

Sample band. Assumes sink, range and refrigerator stay put.

Book a consultation

From $68,000

Full studio remodel

The layout is on the table. Services move, walls can come out, everything is drawn first.

  • Everything in the cabinetry refit
  • Layout change with plumbing and electrical
  • Permit drawings and inspection coordination
  • Lighting design and circuit schedule
  • Flooring and transitions
  • Sixty-day return visit to adjust doors and drawers

Sample band. Our most common engagement.

Book a consultation

Questions

About cost

Our full remodels usually land between $68,000 and $145,000, and small galley kitchens between $42,000 and $78,000. These are sample bands, not quotes. The survey and drawings produce a fixed price.

A design fee at the start, then progress payments tied to milestones: cabinetry order, on-site start, template, and completion. Details are on the financing page.

Yes, in full, against the build if you proceed with us. If you do not, the drawings are yours to take elsewhere.

We photograph it, price it in writing as a variation, and wait for your approval before touching it. Nothing appears for the first time on a final invoice.

Where we stand

A fixed price after a survey beats a low estimate before one.

Every band on this site is a sample. The number that matters comes out of a measured drawing set and it does not move unless you change your mind or a wall surprises us in writing.