Full kitchen remodel
Layout, cabinetry, stone, tile, lighting and floor, drawn and built as one job.
- Schedule
- Typically 9 to 13 weeks on site after drawings are approved
- Band
- $68,000 to $145,000 for a typical inner-Portland kitchen
What we do
Every one of these is a kitchen. We do not take bathrooms, basements or additions, which is the only reason four people can hold this standard.

Services
Layout, cabinetry, stone, tile, lighting and floor, drawn and built as one job.
New doors, drawer fronts and veneered ends on boxes that are still sound.
Template, fabrication, seam planning and installation in quartz, granite, quartzite, porcelain and soapstone.
Free-standing blocks with real clearances, knee space, power and, where needed, ventilation.
Set-out drawings, cut planning, grout joints and edge details that land where they should.
Four layers of light, a real circuit schedule, and the code updates an old panel needs.
Subfloor correction, the right underlayment, and transitions that do not become trip edges.
Under 120 square feet, where an inch either way changes whether the room works.
All figures are sample bands for orientation. A price becomes binding only after a measured survey and approved drawings.
Scope lock
This list is longer than the one above and it is deliberate. A studio that takes every job becomes a general contractor, and a general contractor cannot know a kitchen the way we intend to.
If you are remodelling a whole house we will happily recommend somebody, and we will still draw your kitchen for them.
Common questions
More at the full question page, including permits, payment stages and what happens when a wall opens up on a surprise.
All questionsOnly kitchens. We do not take bathrooms, basements, additions or whole-house remodels, and we do not subcontract them out either. One room type is how four people can keep the standard where it is.
A full remodel is typically 9 to 13 weeks on site once drawings are approved, and a small galley 6 to 8. Design and specification before that is usually 4 to 6 weeks, and cabinetry lead time runs alongside it.
Survey appointments are generally within two weeks. Build start dates are typically 10 to 14 weeks out (sample figure, updated as the calendar moves).
Almost every client does. We set dust barriers, run negative air during demolition, and help you set up a temporary sink and refrigerator elsewhere before the old kitchen comes out.
Where we stand
Two to three hours in your kitchen produces the measured plan, the services layout and two scale options. It costs $1,450 as a sample price, and it comes off the build if you go ahead with us.
We value your privacy
We use cookies to run this site, remember your preferences and understand how it is used.Cookie policy