All services

Kitchen service

Cabinet refacing and refronting

New doors, drawer fronts and veneered ends on boxes that are still sound.

Schedule
Three to five days on site, four to six weeks after the order
Budget
$9,500 to $24,000 for a typical 22 to 32 front kitchen
Area
Inner Portland
Cabinet refacing and refronting carried out by the studio

Overview

What this work actually is

Refacing keeps the carcasses and replaces everything you see and touch. New doors and drawer fronts, new hinges and slides, veneer over the visible case edges and ends, and new hardware. Done properly it is indistinguishable from new cabinetry from two feet away.

It is the right answer when the layout already works and the boxes are plywood in good condition. It is the wrong answer when the boxes are particleboard that has swollen under the sink, when the layout has a blind corner you hate, or when you want drawers where there are currently doors, because that is a new box.

What is included

Everything below is in the price

If something is not listed here it is not assumed. Anything outside this list is quoted separately and in writing before it happens.

Studio carpenter working on a kitchen installation
  • Box survey: material, square, level, water damage, slide condition
  • New doors and drawer fronts in your chosen style and finish
  • 3/4 in matching veneer to face frames, case edges and exposed ends
  • New concealed hinges and full-extension undermount slides
  • New drawer boxes where the existing ones are stapled or damaged
  • Hardware, bumpers and a full door and drawer alignment pass

How it runs

3 stages

  1. 01

    Assessment

    We open every door, pull every drawer and check the boxes. If refacing is the wrong call we say so before you have paid for a design.

  2. 02

    Measure and order

    Every opening measured individually. Pre-war kitchens are rarely consistent, so no two doors are assumed identical.

  3. 03

    Fit

    Three to five days on site. Old fronts off, veneer on, new fronts hung, everything aligned to a 3 mm reveal.

What moves the price

Where the money goes

  • Roughly a third to a half the cost of new cabinetry (sample)
  • Three to five days on site rather than nine weeks
  • Your counters, splashback and floor stay where they are
  • Far less material to the landfill
Number of fronts
Priced per door and per drawer front, not per linear foot.
Door style
A flat slab in a matte laminate against a five-piece painted shaker is a real spread.
Drawer box replacement
Adding soft-close undermount slides usually means new boxes.
Exposed ends
Island and peninsula ends need veneer panels, which adds labour.

Sample band: $9,500 to $24,000 for a typical 22 to 32 front kitchen. Sample figure for orientation, not a quote.

Questions

About cabinet refacing and refronting

Call the studio on (503) 555-0202 if yours is not here.

Plywood or solid-wood cases that are square, dry and firmly fixed are worth keeping. Swollen particleboard, racked cases, or anything with a soft floor under the sink is not, and we will tell you.

Yes. The box does not dictate the front. The one limit is inset doors, which need a face frame to sit into, so a frameless box cannot become an inset kitchen.

Yes, when the new run is made in the same programme and finish. We order both together so the paint batch matches.

Where we stand

Book the survey and we will tell you whether this is the right service for your room.

If a cheaper service solves your problem, we will say so. We have talked more than one client out of a full remodel and into four days of refacing.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.